Business Days Calculator

Non-working weekdays
Include end date

Count from the start date up to the end date, optionally including the end. Choose non-working weekdays and enter additional excluded dates. National holidays are not added automatically.

Results

Enter your values and select Calculate.

Dwork=Dall−DexcludedD_{work}=D_{all}-D_{excluded}

About this tool

This calculator counts the working days between two dates, excluding the weekdays you mark as non-working and any extra dates you list, such as public holidays. It is useful for delivery estimates, notice periods, payment terms and project schedules. A business day is a day on which normal business operations take place; in many countries that means Monday through Friday, excluding public holidays.

How it works

Pick a start date and an end date, then choose the weekly days off: Saturday and Sunday, Friday and Saturday, Sunday only, or none. Decide whether the end date itself should count. Finally, list any holidays or other closed days in YYYY-MM-DD format, separated by spaces, commas or line breaks.

The calculator counts every calendar day in the range, removes the weekend days and then removes each listed date that falls inside the range on a working weekday. The result shows business days, calendar days and excluded days, so you can see how the count was built. The start date must not be later than the end date.

Dwork=Dall−DexcludedD_{work}=D_{all}-D_{excluded}

Example

Count from January 1, 2026 to January 31, 2026 with Saturday and Sunday as non-working days, without including the end date. The range covers 30 calendar days, January 1 through January 30. Those days contain four Saturdays and four Sundays, so 8 days are excluded and the result is 30−8=2230 - 8 = 22 business days. Including the end date adds January 31, a Saturday, giving 31 calendar days, 9 excluded days and still 22 business days.

Assumptions and limits

The start date is always counted; the end date is counted only when you choose to include it. Public holidays are not added automatically, so enter them yourself in YYYY-MM-DD format, up to 500 dates. A listed date that already falls on a non-working weekday is not subtracted twice. Half days and time zones are not modeled.

Frequently asked questions

Do business days include weekends?

Usually not. In most places business days are Monday through Friday, but some countries use a Friday–Saturday weekend, which you can select here. The Sunday-only option suits a six-day working week, and the none option counts every day except the dates you list.

Are public holidays counted as business days?

Normally they are not, but holidays differ by country, region and employer. This calculator does not know your holidays, so add each one as an excluded date. For example, January 1, 2026 is counted as a business day unless you enter it. You can paste a whole year of holidays at once; the calculator only subtracts those that fall inside the range on a working day.

Should I include the end date?

It depends on how the deadline is defined. Counting from a start date up to but not including the end date measures elapsed days; including the end date counts both the first and last day. Check the wording of the contract or policy you are applying. In this tool, January 1 to January 2 covers one calendar day without the end date and two with it.

How many business days are in a typical month?

With a Saturday–Sunday weekend and no holidays, a month has between 20 and 23 weekdays, depending on its length and which weekday it starts on. February 2026, for example, has exactly 20 weekdays because it is four full weeks long. Subtract public holidays to get the real figure for your location.

How many business days are in 2026?

With a Saturday and Sunday weekend, 2026 has 261 weekdays. Enter 2026-01-01 as the start and 2026-12-31 as the end, and include the end date to reproduce it. Public holidays reduce that number and vary by country and region, so add yours for an accurate working-day count.

Link with your values

Add these parameters to this page’s address to open it with the values filled in, for example to share a calculation or to link to it from an AI assistant. The result is calculated in the browser: the page HTML shows an example for the default values, and the tool sets the data-url-params attribute once the link’s values are applied.

ParameterValueIf omitted
start_dateStart datedate: YYYY-MM-DDrequired
end_dateEnd datedate: YYYY-MM-DDrequired
weekendNon-working weekdaysone of: sat_sun, fri_sat, sun_only, nonedefault sat_sun
include_end_dateInclude end datetrue or falsedefault false
holidaysAdditional excluded dates (YYYY-MM-DD)values separated by commas: 2,4,4,6optional

Examples

  • ?start_date=2026-11-02&end_date=2026-12-31&holidays=2026-11-26,2026-12-25
  • ?start_date=2026-03-01&end_date=2026-03-31&weekend=fri_sat&include_end_date=true

Write decimals with a point. Encode a space as %20, + as %2B, # as %23 and & as %26.

Result elements: [data-result-block="business_days_calculator"]